One Excellent Job Leads To Another
A&A Workshops Critical Infrastructure Upgrade


Dual-Site Modernization
1. Almaza Workshop Door Replacement
New Systems Installed
- (2) 4m x 4m motorized roll-up doors
- Features:
- Dual-mode operation (auto/manual)
- Wind-rated for desert storms
- EMI-shielded controls
2. Wadi Houf Generator Overhaul
1100 KVA Cummins Refurbishment
- Engine rebuild with OEM kits
- Control system modernization:
- New digital governor
- Touchscreen HMI
- Fuel system upgrades
Technical Specifications
Component Standards & Performance Gains
Component | Standard | Performance Gain |
---|---|---|
Roll-Up Doors | ANSI/DASMA 105 | 50% faster operation |
Generator | ISO 8528-5 | 98% voltage regulation |
Control System | IEEE 1547 | Remote monitoring capable |
Execution Highlights
Almaza Workshop
- Installed doors during live munitions handling
- Zero downtime achieved
Wadi Houf Generator
- 72-hour load bank test at 110% capacity
- 10-year engine life extension
Project Outcomes
- Reliability: Zero door failures since installation
- Power Stability: 99.9% generator availability
- Cost Savings: 60% vs. new generator purchase
Information About the Project
Location |
Almaza & Wadi Houf Facilities, Egypt |
End-User | Air Defense, Egyptian Armament & Ammunition Department |
Award Date | November 2018 |
Contract | W912ER-19-F-0010 |