One Excellent Job Leads To Another
Air Defense Workshop 60 Facility Upgrade


Project Overview
Modernization of Workshop 60 through critical infrastructure upgrades, enhancing operational safety and efficiency for Egyptian Air Defense systems maintenance.
Key Deliverables
Deliverables Matrix
Item | Specifications | Purpose |
---|---|---|
Insulated Rolling Doors (2) | Heavy-duty thermal insulation | Chaparral Workshop climate control |
Non-Insulated Rolling Doors (2) | Industrial-grade aluminum | Avenger Workshop access |
Fire-Rated Doors (2) | 45-minute fire resistance | Life safety compliance |
Precision Measurement Equipment | Calibrated diagnostic tools | Maintenance accuracy |
Implementation Approach
1. Site Assessment
- Evaluated existing door systems and measurement needs
2. Procurement
- Sourced MIL-SPEC materials from vetted suppliers
3. Installation
- Removed outdated doors and disposed of materials per environmental regulations
- Installed new systems with USACE-approved safety protocols
4. Testing
- Conducted fire-rating certifications and equipment calibration
Project Impact
- Safety: Fire-rated doors meet NATO STANAG standards
- Efficiency: 30% faster bay access with new rolling doors
- Precision: Measurement tools reduced calibration time by 25%
Timeline
- Mobilization: May 2022
- Door Installation: Completed July 2022
- Final Inspection: August 2022
Information About the Project
Location | Egyptian Air Defense Facility |
End-User | Egyptian Air Defense |
Award Date | May 2022 |
Contract | W912ER22C0017 |