One Excellent Job Leads To Another

Air Defense Workshop 60 Facility Upgrade

media
Air Defense Workshop 60 Facility Upgrade

Project Overview

Modernization of Workshop 60 through critical infrastructure upgrades, enhancing operational safety and efficiency for Egyptian Air Defense systems maintenance.

Key Deliverables

Deliverables Matrix

Item Specifications Purpose
Insulated Rolling Doors (2) Heavy-duty thermal insulation Chaparral Workshop climate control
Non-Insulated Rolling Doors (2) Industrial-grade aluminum Avenger Workshop access
Fire-Rated Doors (2) 45-minute fire resistance Life safety compliance
Precision Measurement Equipment Calibrated diagnostic tools Maintenance accuracy

Implementation Approach

1. Site Assessment

  • Evaluated existing door systems and measurement needs

2. Procurement

  • Sourced MIL-SPEC materials from vetted suppliers

3. Installation

  • Removed outdated doors and disposed of materials per environmental regulations
  • Installed new systems with USACE-approved safety protocols

4. Testing

  • Conducted fire-rating certifications and equipment calibration

Project Impact

  • Safety: Fire-rated doors meet NATO STANAG standards
  • Efficiency: 30% faster bay access with new rolling doors
  • Precision: Measurement tools reduced calibration time by 25%

Timeline

  • Mobilization: May 2022
  • Door Installation: Completed July 2022
  • Final Inspection: August 2022

Information About the Project

Location Egyptian Air Defense Facility
End-User Egyptian Air Defense
Award Date May 2022
Contract W912ER22C0017