One Excellent Job Leads To Another
Berenice Naval Base ShoreBox Installation
Strategic Naval Infrastructure Upgrade
Scope Of Work
Custom Schneider ShoreBox System
- 440V/60Hz power conversion
- 9 hotel service connections (400A each)
- Integrated safety interlocks
Remote Site Challenges Addressed
- Desert climate hardening (55°C rated)
- Sand filtration for cooling systems
- Corrosion-resistant marine coatings
Technical Specifications
Component Specifications & Benefits
| Component | Specification | Benefit |
|---|---|---|
| Power Modules | 2.5MW capacity | Supports aircraft carriers |
| Control System | Automated load sharing | Prevents overloads |
| Safety Features | IP56 enclosure | Storm/dust protection |
Innovations
- Pre-fabricated cable ramps for rapid deployment
- Dual-fuel backup capability
Operational Impact
- Emissions: Eliminated 900 tons of CO2 annually
- Reliability: Zero service interruptions since commissioning
Information About the Project
| Location |
Berenice Naval Base, Alexandria, Egypt |
| End-User | Egyptian Navy |
| Award Date | May, 2019 |
| Contract | W912ER19-P-0019 |
Our Excellent Job