One Excellent Job Leads To Another
Harpoon Weapons Facility HVAC Modernization


Project Mission
To replace outdated HVAC systems with precision climate control solutions, ensuring optimal conditions for missile testing operations at a critical naval weapons facility.
Scope of Work
1. System Replacement
- Removed obsolete HVAC components
-
Installed:
- (2) Air-cooled condensing units (30-ton capacity each)
- (1) High-efficiency air handling unit
- New electrical infrastructure for 440V power supply
2. Site Preparation
- Roof structural reinforcement
- Weatherproofing and insulation upgrades
3. Performance Validation
- 72-hour continuous operation test
- Humidity/temperature calibration to missile storage specs
Technical Specifications
Component Specifications
Component | Key Feature | Operational Benefit |
---|---|---|
Condensing Units | Scroll compressors | 25% energy savings |
Air Handler | HEPA filtration | 99.97% particulate removal |
Controls | Automated climate logic | ±1°C temperature precision |
Information About the Project
Location |
Ras El-Tin Naval Base, Alexandria, Egypt |
End-User | Egyptian Navy |
Award Date | May 2021 |
SATOC Contract | W912ER21D0002 |
Task Order | W912ER22F0078 |