One Excellent Job Leads To Another
Ras El Tin Naval Base ShorePower Modernization


Strategic Naval Infrastructure Upgrade
Custom Schneider ShoreBox Solution
- Power Capacity: 2.5MW (440V/60Hz)
- Connections: 9 hotel service points (400A each)
- Key Features:
- Harmonic filtering (<3% THD)
- Saltwater corrosion-resistant enclosure
- Dual-fuel backup capability
Multi-Phase Implementation
Phase | Key Deliverables |
---|---|
1 (2016) | ShoreBox procurement & factory testing |
2 (2017) | Pier electrical infrastructure upgrades |
3 (2017) | Turnkey installation & commissioning |
Technical Specifications
Component Standards & Operational Benefits
Component | Standard | Operational Benefit |
---|---|---|
Power Modules | IEEE 45 | 99.98% uptime since install |
Control System | MIL-STD-1399 | Automated load sharing |
Safety Systems | NFPA 70E | Arc-flash protection |
Operational Impact
- Emission Reduction: 1,200 tons CO2 annually
- Reliability: Zero power interruptions in 5+ years
Execution Highlights
- Installed during active naval operations
- Custom-designed cable management for tidal variations
- Trained 30 Egyptian Navy technicians
Project Legacy
Follow-On Contracts
- 2018: Expanded to 3 additional piers
- 2019: Integrated solar hybrid capability
Information About the Project
Location |
Ras El-Tin Naval Base, Alexandria, Egypt |
End-User | Egyptian Navy |
Award Period |
April 2016 - August 2017 |
Contract |
W912ER-16-P-0014, W912ER-17-P0031, W912ER17-C-0013 |