One Excellent Job Leads To Another
Torpedo Workshop Modernization


Comprehensive Facility Upgrade
Critical Systems Overhauled
System | Upgrade | Military Standard |
---|---|---|
Electrical | New lighting & panels | MIL-STD-810H |
Fire Safety | Suppression & alarm system | NFPA 72 |
Structural | Blast-resistant steel doors | STANAG 4569 |
HVAC | High-efficiency cooling | ASHRAE 90.1 |
Key Improvements
1. Weapons Testing Safety
- Installed explosion-proof lighting in test rooms
- Upgraded grounding to handle 40kA fault current
2. Operational Reliability
- New frequency converter (400Hz/60Hz)
- 30% more efficient HVAC system
3. Emergency Preparedness
- Dual-action fire suppression (FM-200 + water mist)
- Heat-resistant door seals (withstands 1000°C)
Performance Metrics
- Energy Savings: 25% reduction in power consumption
- Safety: 100% compliance with naval weapons handling standards
- Downtime: Limited to 12 non-consecutive days
Information About the Project
Location |
Ras El-Tin Naval Base, Egypt |
End-User | Egyptian Navy |
Award Date | March 2020 |
Contract | W912ER20C0011 |