One Excellent Job Leads To Another
TPS-59 Radar Power System Restoration


Project Overview
Objective: Restore and upgrade 7 KATO Motor Generators (Model 22328000) to ensure reliable 400Hz power for radar operations.
Key Interventions
- Mechanical: Bearing replacements, rotor balancing, shaft alignment
- Electrical: Stator rewinding, insulation upgrades, NEC-compliant wiring
- Control Systems: Modernization of panels with digital meters, breakers, and timers
- Structural: Corrosion treatment, epoxy coatings, vibration damping
Site-Specific Repairs & Outcomes
Repair Locations & Results
Site | Repair Focus | Outcome |
---|---|---|
Port Said | Complete motor overhaul | Restored 24/7 operational readiness |
El Mansura | Exciter stator rewiring | Eliminated voltage fluctuations |
Balteem | Rotor dynamic balancing | Reduced vibration by 40% |
Sidi Barani | Structural reinforcement | Extended service life by 10+ years |
Inshas | Control panel modernization | Enabled remote monitoring capabilities |
Zaafrana | Full insulation enhancement | Achieved >7 GΩ post-repair (from 0.5 GΩ) |
RBW 1 (Cairo) | OEM-grade bearing replacements | Noise reduction and improved efficiency |
Technical Interventions
A. Mechanical Repairs
- Replaced SKF military-grade bearings in all units
- Rotor dynamic balancing (Zaafrana, Balteem)
- Shaft eccentricity checks and machining
B. Electrical Upgrades
- Stator insulation enhancement (varnish, epoxy, anti-flash coating)
- Surge protector and rectifier diode replacements (Zaafrana, Inshas)
- Leakage current reduced to <10nA (from 236nA in Zaafrana)
C. Control System Modernization
- Replaced analog meters with digital displays (voltage, current, frequency)
- Installed star-delta timers and 600A breakers
- New wiring with labeled conduits (NEC compliance)
D. Structural Improvements
- Corrosion-resistant painting (all units)
- Sheet metal repairs (Zaafrana, Sidi Barani)
- Vibration-dampening mounts (Port Said, RBW 1)
Execution Strategy
Phased Deployment
- Survey (2018): Thermographic, speed, and insulation tests
- Repair (2020–2021): Staggered by site (Zaafrana first, RBW 1 last)
- Testing: 72-hour load tests post-repair
OEM Collaboration: KATO-certified technicians for critical units
Documentation & Deliverables
- Per-Site Reports: Detailed documentation (e.g., Zaafrana Report Rev. 1.docx)
- Test Exhibits: RMS voltage/current graphs (input/output)
- Performance Data: Thermographic comparisons (e.g., 55.8°C → 30.7°C)
- Validation Tests: Motor speed tests (1500 RPM achieved)
Information About the Project
Locations |
Port Said, El Mansura Balteem, Sidi Barani Inshas, Zaafrana RBW, Cairo |
End-User | Egyptian Armament & Ammunition Department |
Award Date | September 2020 |
Contract | M67854-20-R-2032 |